COFFEY BUILDING GROUP PROJECTS
Jesuit High School Chapel

Carmichael, CA - to be completed Spring 2015

 

Description: 10,478 square foot Chapel 

Cost of Construction:  $10,000,000

General Contractor: Swinerton Builders

Contract Value: $1,092,450

Scopes of Work:  Metal stud framing, drywall, lath and plaster, insulation

Special Highlights: Our team assisted with budgets and value engineering.

 

Folsom Lake College Gymnasium

Folsom, CA - to be completed 2015

 

Description: Metal stud and structural steel framed building with exterior waterproofing management system

Cost of Construction:  $14,000,000

General Contractor: Flintco

Contract Value: $1,300,000

Scopes of Work:  Metal Stud framing, Drywall and waterproof exterior management systems

Special Highlights: Our team assisted with budgets through design to completion  keeping the project within budget. We aided in Value Engineering design for the exterior water management system.

TEAM PROJECTS
Sacramento International Airport

Terminal B

 

Description: 424,000 SF terminal B and 316,000 SF concourse includes a 19 gate passenger concourse with international arrivals facility, office space and people mover.   A LEED Silver certified project.

Cost of Construction:  $1,000,300,000

General Contractor: Austin/Walsh Joint Venture

Contract Value: $17,000,000

Scopes of Work:  Metal stud, drywall, acoustical ceilings and fireproofing

Special Highlights: The team provided 1.5 years of design assist and value engineering options as well as extensive scheduling coordination. the project finished three months early and $70M under budget. Earned 2011 Construction Excellence Gold award for ceilings - Western Region.

Mondavi Center for the Performing Arts

Davis, CA

 

Description: This state of the art structure serves as venue for local and world-reknowned performances.  The facade is a large glass paneled lobby surrounded by sandstone, which also lines the interior walls.

Cost of Construction:  $60,900,000  

General Contractor: McCarthy Construction

Contract Value: $5,000,000

Scopes of Work:  Metal stud framing, drywall, exterior sheathing, lath, plaster, and fireproofing

Special Highlights: Value engineering, schedule input, constructability analysis, and project management.

Cal Trans District 3 Headquarters 

Marysville, CA

 

Description: 230,000 sf design/build proejct earning LEED Silver certification.  The 5 story building provides offices for 758 staff, as well as a 200 seat auditorium.

Cost of Construction:  $65,000,000

General Contractor:  Turner Construction

Contract Value: $2,800,000

Scopes of Work:  Metal stud framing, drywall

Special Highlights: The team provided design assist and value engineering services.